Category Archives: Area closure
Getting Around UT April 2024 Construction Edition
Melrose Ave by Alumni House closes, Communication upgrades, G5/30 exit to Fulmer closed, Steam line construction, Stormwater Park repairs, Pedestrian Pathways
Horseshoe parking impacted as Haslam II begins construction
Greve, Dunford, and Henson Halls significantly reduced parking in the horseshoe parking area starting Tue, Mar 19th. The contractors are […]
March 2024 concert load-in closes S21, S23-Steam Plant, and S5 lots one day prior to event
March 2024 concert load-in closes S21, S23-Steam Plant, and S5 one day prior to concert
S12 on Caledonia closes Sun, Dec 17th for construction
S12 on Caledonia closing spaces for construction of new residence hall Sun, Dec 17th 6 pm.
S21, S23 at Steam Plant, and S5 close 5pm Fri Dec 15th event load-in
S21, S23 at Steam Plant, and S5 at arena close Fri, Dec 15th for concert load-in
Residence Hall construction closes two lots and impacts mobility
Two parking areas turned over to Housing for two new residence halls. Changes to lots and additional Non-commuter parking capacity.
Elevator repairs at Reese Hall 12-18, part of N8 closes
Portion of N8 closed Dec 18, 2023 to Jan 6, 2024 for elevator repairs
N3 non-commuter lot will become new Caledonia Residence Hall
N3 parking area (long skinny parking lot between Caledonia and Terrace Ave) closes Thu, Dec 14th to begin construction on new Caledonia Residence Hall
S21 and 23D at Steam Plant close 5pm Thu Nov 30 for NCAA tournament
S21 and S23D close 5pm Thu Nov 30th for NCAA Volleyball tournament preparations.
Partial closure of Phillip Fulmer Fri, Dec 1 to Aug 2024
Partial closure of Phillip Fulmer Way from Fri, Dec 1, 2023 through August 2024. Phase 1 starts Dec 1st with Neyland Stadium renovation. Phase 2 is expected to start in February with a steam line replacement.