Getting Around UT April 2024 Construction Edition

2024 Getting Around UT April Construction edition Issue 95

Page One – Construction Line Upgrades

  • Melrose in front of Tyson Alumni House close

Page Two – Stormwater Park (next to Rocky Top Dining Hall)

  • Crane installed on Francis St near Robinson Hall

Page Three – Road direction changes near Lake Ave

  • Construction on Cumberland impacts road direction near Lake Ave

Page Four – Haslam II Construction

  • Important Pedestrian Path and Bus access information

Page Five – Andy Holt Residence Halls

  • Reminder for Pedestrian Paths – Do NOT walk in the street

Page Six – Steam Line Project on Fulmer

  • G5/30 exit onto Phillip Fulmer closed due to steam line starting