Visitor Parking will be greatly impacted by construction on the UT campus this summer.
In May projects are ramping up:
- Andy Holt Ave – closed between UT Dr and Vol Blvd – May 15-18
- Steam Line by Hodges – expanded May 15-22 to close intersection at Melrose and Vol Blvd
- Lower Dr closed from May 15-July 31 – Middle Dr to Estabrook
Streetscape Phase II a and b starts June 1
Intermittent closures of Phillip Fulmer Way from Cumberland to Student Union for paving this summer
Lake Ave will also have sporadic closures for the Lake Ave Garage new bldg (east of current bldg)