Monday July 1 Phillip Fulmer Way from Middle Dr (at Pedestrian Bridge) to Lake Loudoun Blvd will be paved.
Wednesday July 3 Lake Loudoun Blvd will be paved the complete length.
week of July 1 paving Fulmer and Lake Loudoun Blvd
Monday July 1 Phillip Fulmer Way from Middle Dr (at Pedestrian Bridge) to Lake Loudoun Blvd will be paved.
Wednesday July 3 Lake Loudoun Blvd will be paved the complete length.